Sette Models


NEXT SHOW, GUILDEX SEPTEMBER 2012


Good progress is being made on production of the first batch of Jubilees. We are making two production samples just as a final check.


The painted pilot sample for the GWR Single has been delivered and we are checking for any corrections required. After this the factory will make our pre-production sample model which will be fitted with DCC sound. This will be checked for details and running (6' rad min)then the factory will prepare a final set of drawings for checking before production begins.


LMS Patriot model drawing have been checked. Next stage detail parts drawings then the brass pilot model.


To continue our LMS 4-6-0 line for 2013 we will make a batch of rebuilt Scots and Patriots


 

GWR City 4-4-0, Manor 4-6-0, LMS Princess, LMS Compound classes added to our list of future models.

 


Our factory in Korea has built a double line oval testing track . This will allow models to be continually checked all through the construction process and before they are packed for shipping to the UK.